Shine Bright: Preview Part VI

The piecing of the top is finished! I’ve given it a good press but as is the way with Autumn, it’s dark outside and my photos are cruddy.

DSCF0184

I’m going to longarm it myself, I’m just finalising when I can hire a machine, but hopefully in the next fortnight and then I can get proper photos. The plan is to release this – the first Quilt Workout pattern – before Christmas if I can, though if it’s done in the Chrimbo Limbo period that won’t be too bad and I will have a load of time to write then too.

q-workout-logoI’ve made a logo, I’ve started creating my template. I’m pretty much ready to go, just got the small matter of real life work to see to first. Five weeks from now I will be out of work, without a sewing machine, packing up my home and probably not sleeping much.

3 Comments

  1. Posted November 11, 2015 at 9:27 am | Permalink

    It’s looking great. Good luck with the real life stuff, exciting and probably a little bit scary too!

  2. Posted November 11, 2015 at 1:40 pm | Permalink

    oh time is flying – so exciting! i love this pattern and was wondering how it would look all finished and it looks great!

  3. Posted November 18, 2015 at 9:47 am | Permalink

    Love how it looks! And your purdy logo 🙂

Post a Comment

Your email is never shared. Required fields are marked *

*
*